Electricity demand uncertainty modeling with Temporal Convolution Neural Network models
dc.contributor.author | Ghimire, Sujan | |
dc.contributor.author | Deo, Ravinesh C. | |
dc.contributor.author | Casillas-Pérez, David | |
dc.contributor.author | Salcedo-Sanz, Sancho | |
dc.contributor.author | Acharya, Rajendra | |
dc.contributor.author | Dinh, Toan | |
dc.date.accessioned | 2024-11-29T12:51:29Z | |
dc.date.available | 2024-11-29T12:51:29Z | |
dc.date.issued | 2025-03 | |
dc.description | The required data was provided by Energex. The study received partial funding from the Ministry of Science and Innovation, Spain (Project ID: PID2020-115454GB-C21). Partial support of this work was through the LATENTIA project PID2022-140786NB-C31 of the Spanish Ministry of Science, Innovation and Universities (MICINNU) . | es |
dc.description.abstract | This work presents a Temporal Convolution Network (TCN) model for half-hourly, three-hourly and daily-time step to predict electricity demand ( ) with associated uncertainties for sites in Southeast Queensland Australia. In addition to multi-step predictions, the TCN model is applied for probabilistic predictions of where the aleatoric and epistemic uncertainties are quantified using maximum likelihood and Monte Carlo Dropout methodologies. The benchmarks of TCN model include an attention-based, bi-directional, gated recurrent unit, seq2seq, encoder–decoder, recurrent neural networks and natural gradient boosting models. The testing results show that the proposed TCN model attains the lowest relative root mean square error of 5.336-7.547% compared with significantly larger errors for all benchmark models. In respect to the 95% confidence interval using the Diebold–Mariano test statistic and key performance metrics, the proposed TCN model is better than benchmark models, capturing a lower value of total uncertainty, as well as the aleatoric and epistemic uncertainty. The root mean square error and total uncertainty registered for all of the forecast horizons shows that the benchmark models registered relatively larger errors arising from the epistemic uncertainty in predicted electricity demand. The results obtained for TCN, measured by the quality of prediction intervals representing an interval with upper and lower bound errors, registered a greater reliability factor as this model was likely to produce prediction interval that were higher than benchmark models at all prediction intervals. These results demonstrate the effectiveness of TCN approach in electricity demand modelling, and therefore advocates its usefulness in now-casting and forecasting systems. | es |
dc.identifier.citation | Sujan Ghimire, Ravinesh C. Deo, David Casillas-Pérez, Sancho Salcedo-Sanz, Rajendra Acharya, Toan Dinh, Electricity demand uncertainty modeling with Temporal Convolution Neural Network models, Renewable and Sustainable Energy Reviews, Volume 209, 2025, 115097, ISSN 1364-0321, https://doi.org/10.1016/j.rser.2024.115097 | es |
dc.identifier.doi | 10.1016/j.rser.2024.115097 | es |
dc.identifier.issn | 1879-0690 (online) | |
dc.identifier.issn | 1364-0321 (print) | |
dc.identifier.uri | https://hdl.handle.net/10115/42179 | |
dc.language.iso | eng | es |
dc.publisher | Elsevier | es |
dc.rights | Attribution-NonCommercial-NoDerivatives 4.0 Internacional | * |
dc.rights.accessRights | info:eu-repo/semantics/openAccess | es |
dc.rights.uri | http://creativecommons.org/licenses/by-nc-nd/4.0/ | * |
dc.subject | Deep learning | es |
dc.subject | Temporal Convolution Network | es |
dc.subject | Uncertainty analysis | es |
dc.subject | Hybrid models | es |
dc.subject | Long Short-term Memory network | es |
dc.title | Electricity demand uncertainty modeling with Temporal Convolution Neural Network models | es |
dc.type | info:eu-repo/semantics/article | es |
Archivos
Bloque original
1 - 1 de 1
Cargando...
- Nombre:
- 1-s2.0-S1364032124008232-main.pdf
- Tamaño:
- 8.92 MB
- Formato:
- Adobe Portable Document Format
- Descripción:
Bloque de licencias
1 - 1 de 1
No hay miniatura disponible
- Nombre:
- license.txt
- Tamaño:
- 2.67 KB
- Formato:
- Item-specific license agreed upon to submission
- Descripción: